This blog contains an updated discussion focusing on Business Objects Planning and Consolidation 10.0, version for Netweaver (BPC10NW) installation considerations. For information on installation options for BPC75NW, please review the blog at:
There are two main installation paths that can be chosen for your SAP Business Objects Planning and Consolidation 10.0, version for Netweaver (BPC10NW) implementation: you can install BPC10NW within your current BW system (the "Add On" method) or you can install BPC10NW on a separate BW system (the "Stand Alone" method). Each installation method has pros/cons that should be considered prior to deciding upon an implementation path.
Prerequisites:
SAP Business Objects Planning and Consolidation 10, version for Netweaver (BPC10NW), must be installed on a suitable Netweaver platform. For BPC10NW, the Netweaver platform version must be Netweaver 7.3.
A very common question that is asked is: “Which is better: Add-On vs. Stand Alone?” The answer varies for each customer since it depends on a number of factors that need to be evaluated for each implementation:
- Hardware Investment
- Performance
- Administration Costs
- Integration Development and Maintenance
- Upgrade Considerations
- Support Pack Considerations
- BWA Investment
- Data Movements
There is typically some increase in hardware investment when implementing any BPC10NW project. The Stand Alone scenario will lead to some additional cost for servers required for creating the new instance of BW that will be used to support the BPC10NW application. However following an “Add-On" implementation scenario will also require additional application servers to accommodate the anticipated incremental BPC10NW user load on the existing BW system. The net hardware cost differences between "Stand Alone" and "Add-On" may be negligible.
Performance
On initial reflection, the Stand Alone scenario may be presumed to inherently have superior performance; however this is not necessarily the case if the Add-On scenario is properly sized. In addition, load balancing is also an important consideration to ensure overall system responsiveness (for example, BPC10NW processes can be isolated from BW processes, from a load balancing perspective, if desired).
Administration Costs
System Admin costs may be greater with a Stand Alone implementation since an additional host system will need to be maintained, tuned, monitored, etc.
However if the administration support is provided using in-house resources, the additional cost may be negligible by being easily absorbed into the existing in-house administration support model.
If system administration is out-sourced, then additional cost should be anticipated (as most external support contracts charge by system instance).
Additional consideration should be anticipated to keep your out-sourced system up to date with current support packs and corrections. Failure to maintain the system can result in increased administration and operational costs through the need to research and implement corrections that have already been developed for more current support pack levels.
Integration Development and Maintenance
There are a variety of ETL tools to pull master and transactional data into BPC10NW, but these tools typically point to BW objects (info cubes and info objects) within the hosting BW for source input. Following a Stand Alone implementation path, additional processes will need to be developed to load the source data into the BPC10NW supporting NW environment. This additional configuration will need to be developed and, of course, maintained.
Upgrade Considerations
New BW functionality is continuously being deployed and customers struggle to determine the best timing to upgrade their systems. In a Stand Alone deployment, it may be easier to upgrade your main BW system while leaving your BPC10NW hosting BW system at an earlier revision. One of the main benefits to the stand alone path is the elimination of many of the dependencies between BW upgrades and BPC10NW upgrades. This decoupling may be a significant consideration since currently BPC10NW is currently only supported by Netweaver 7.3. For example, using the Add On approach, you can leave your EDW environment at an earlier version (i.e.: NW7.0) and still support BPC10NW by implementing an updated version of NW (i.e.: NW 7.3) without forcing an EDW upgrade (and eliminate/postpone any additional costs associated with such an upgrade).
Recognize that system upgrades depend on a number of business environmental factors: corporate politics, the needs and schedule of the end user work streams (i.e.: Finance, Sales, Marketing, HR, etc.), and the technical capacities to perform the work. Some companies elect to upgrade their systems on regular basis, others are more conservative and will upgrade infrequently if the system performance is acceptable.
Support Pack Considerations
Certain highly regulated industries require extensive regression testing of all BW processes after implementation of any support packs. Even companies that are not specifically bound by industry regulations should always consider some planned regression testing after any system change is introduced (i.e.: support pack, individual correction, SAP kernel updates, OS kernel updates, DB patch updates, etc...). Similar to the discussion surrounding "Upgrade Considerations", a decoupled system approach allows timely support pack implementation for BPC10NW without the need for extensive regression testing of the main BW system.
Akshay Vellanki
Partner & Director EPM Practice
Techincept Consulting Inc.
www.techincept.com
SAP BPC TRAINING
310-956-1113
AkshayVellanki@gmail.com
www.techincept.com/sapbpctraining.html